Deck Removal Dumpster Rental
Long lumber, railings, and footings need room and a clear path.
A deck comes apart into long, awkward lumber that takes up far more room than it did standing up. Most jobs call for a 15 or 20 yard deck removal dumpster rental. Your yard layout and any concrete footings shape the plan from there.

15 Yard or 20 Yard for a Deck
Most deck removals fit a 15 or 20 yard dumpster, based on the size of the deck and how much of it comes out. Lumber usually sizes by volume, since boards and joists do not stack tightly. Take the time to cut long pieces down and they will pack better.
Weight enters the picture when concrete or composite is part of the job. A 14 to 18 yard dumpster typically runs $350 to $500, and a 20 to 25 yard typically runs $400 to $600, depending on location and rental length.
Boards and Railings
These make up the bulk of the load. Balusters and railing sections catch air, so break them apart before loading.
Joists and Framing
The longest pieces on the job. Cut them down so they lie flat and do not stick above the fill line.
Concrete Footings
Small amounts are often accepted, but they weigh a lot. Mention them at booking so the size and allowance match.
What Comes Off a Deck
A full tear-out typically produces the materials below. Pressure-treated lumber is generally accepted in standard roll-off dumpsters, though local rules can vary. Check composite decking and concrete against the accepted items guide before you load.
- Decking boards
- Railings and balusters
- Support posts
- Joists and framing
- Concrete footings
- Fasteners and hardware
- Composite decking
Getting the Dumpster Close to the Work
Decks sit behind the house, so placement matters more here than on most jobs. The dumpster typically goes in a side yard or backyard with access instead of the driveway. A wide gate, side yard, or wrap-around driveway often gives the truck enough room, but confirm it before delivery day.
Share your yard layout when you book. Measure the gate, note any low branches or tight corners, and tell the hauler where the deck sits. If the truck cannot reach the backyard, you will be carrying long lumber farther, so plan your labor around that.
Plan the Tear-Out
Work from the top down: railings first, then boards, then joists and posts, with footings last. That order keeps the heaviest material near the end, when you can see how much room and allowance you have left. Most rentals include 7 to 10 days, and many haulers offer daily extensions.
If footings turn out bigger than you expected, stop and call your hauler before loading them. It is simpler to adjust the plan than to deal with an overage charged per ton.
Questions
Can pressure-treated lumber go in a dumpster?
Yes, in most roll-off dumpsters, although local rules can vary. Confirm with your hauler if you are unsure.
Can concrete footings go in with the lumber?
Small amounts are often accepted, but they are heavy. Mention them when you book so the rental fits the weight.
Can the truck reach my backyard?
Often, yes, if you have a wide gate, side yard, or wrap-around driveway. Confirm access with your hauler before delivery.
Is deck debris sized by weight or volume?
Mainly volume, unless concrete or composite adds significant weight.
Where will the dumpster sit for a deck tear-out?
Typically in a side yard or backyard with access rather than the driveway, so debris has a short trip.
Does composite decking go in the same dumpster?
It may. Composite should be checked against the accepted items guide first, since it can add weight and rules vary.
Ready to rent a dumpster?
Check local pricing and availability for your address.

